Calculate cement bags, sand and aggregate for any concrete pour. UAE dry volume factor 1.54 built-in.
m
m
m
🇦🇪 UAE Tip: Always add 10% wastage for UAE concrete pours. Use SRC cement for foundations where UAE groundwater contains sulfates. Pour concrete early morning (before 8am) in summer months.
Calculate cement bags and sand for mortar, blockwork and plastering.
m³
🇦🇪 UAE Tip: Always use washed fine sand for UAE mortar. Dune sand and sea sand are prohibited — high salt content causes structural failure. 1:4 mix is standard for UAE internal blockwork.
Calculate weight per metre and total weight for any rebar diameter and length.
m
🇦🇪 UAE Tip: UAE uses Grade 500 (B500B) deformed bars per BS 4449. Weight formula: D² ÷ 162 kg/m. Add 5% for laps and wastage. T12 at 150mm centres is standard for most UAE villa slabs.
Calculate number of AAC or concrete blocks for any wall area.
m²
🇦🇪 UAE Tip: AAC blocks are preferred in UAE for thermal insulation — reduces AC load. Add 10% wastage for cutting around openings. Use AAC-specific thin bed mortar (2-3mm joints) for best results.
Calculate formwork area and plywood sheets for slabs, beams and columns.
m²
m
m
m
m
🇦🇪 UAE Tip: 18mm film-faced plywood is UAE standard for slab soffit formwork. Apply form release oil before every pour. Strip slab formwork minimum 14 days after pour in UAE summer heat.
Calculate scaffolding standards, ledgers, transoms and working platforms.
m
m
🇦🇪 UAE Tip: UAE scaffolding must comply with Dubai Municipality requirements. System scaffolding (Ringlock/Cuplock) required for buildings above 20m. All scaffolding must be inspected every 7 days on UAE sites.
Calculate sand backfill volume and weight for trenches and foundations.
m
m
m
🇦🇪 UAE Tip: Never use sabkha soil for backfill in UAE — high salt content causes severe corrosion to buried pipes, cables and foundations. Use clean washed fill sand and compact to minimum 95% MDD.
Calculate risers, treads, concrete volume and rebar for any staircase.
m
mm
m
mm
🇦🇪 UAE Tip: UAE Fire Code: max riser 190mm, min tread 250mm residential. Min 175mm riser 275mm tread commercial. Continuous handrail at 900mm height minimum. Use M25 concrete with 40mm cover for staircase durability.
Calculate tile quantity, adhesive and grout for any floor or wall area.
m²
mm
mm
🇦🇪 UAE Tip: 600×600mm and 800×800mm large format tiles are most popular in UAE villas. Always buy 10-15% extra and keep offcuts for repairs — UAE tile batches vary between production runs.
Calculate paint litres needed for any room or building.
m²
m²
🇦🇪 UAE Tip: UAE exterior walls need minimum 2 coats over 1 coat alkali-resistant primer. In coastal UAE areas use weathershield paint with anti-fungal and salt-resistant properties. Allow 28 days curing before painting new plaster.
Calculate number of 8×4 plywood sheets for any area.
m²
🇦🇪 UAE Tip: 18mm film-faced plywood is UAE standard for concrete formwork. Standard 8×4 sheet = 2.44×1.22m = 2.97m². Quality film-faced ply can be reused 15-25 times. Store in shade on UAE sites.
Calculate flooring area and material quantity with wastage.
m²
🇦🇪 UAE Tip: Large format porcelain tiles (600×600mm to 1200×600mm) are most popular in UAE villas. Engineered wood is preferred over solid wood for UAE bedrooms — more stable in AC-to-outdoor humidity swings.
Calculate epoxy primer, body coat and topcoat quantities.
m²
🇦🇪 UAE Tip: Use solvent-free epoxy for UAE applications. Apply when substrate temperature is between 10-35°C — avoid UAE summer midday. Minimum concrete strength 25MPa before applying epoxy. HDT above 60°C required for UAE heat resistance.
Calculate suspended ceiling tiles, T-bar grid and suspension wires.
m²
🇦🇪 UAE Tip: Standard UAE office ceiling: 600×600mm mineral fibre tiles in exposed T-bar grid. Suspend at maximum 1200mm from structure. In UAE seismic zone 2A use lateral bracing wires at maximum 3600mm centres.
Calculate gypsum boards, metal studs, tracks and screws for partition walls.
m²
🇦🇪 UAE Tip: 12.5mm standard board for UAE partitions. 15mm for fire-rated. UAE Civil Defence requires minimum EI60 (60-min fire rating) for corridor and staircase enclosures. Use moisture-resistant board in wet areas.
Calculate raised floor panels, pedestals and stringers for data centres.
m²
🇦🇪 UAE Tip: UAE data centres require 450-600mm raised floor void for hot aisle/cold aisle cooling. Minimum 10 kPa (1000 kg/m²) UDL for server areas. Specify ESD anti-static tiles for IT rooms per TIA-942 standard.
Calculate window frame length, glass area and accessories.
m
m
🇦🇪 UAE Tip: UAE buildings require Low-E DGU (double glazed units) with max SHGC 0.25 per UAE Green Building Regulations. Use 6063-T5 aluminium alloy with PVDF coating for coastal UAE locations within 2km of sea.
Calculate waterproofing membrane, primer and protection board.
m²
🇦🇪 UAE Tip: Two-layer SBS modified bitumen membrane is UAE standard for flat roofs. Add UV-resistant aluminium cap sheet — reduces roof surface temperature from 90°C to below 50°C in UAE summer. Test bathrooms with flood test before tiling.
Calculate curing duration and water requirement for UAE conditions.
m²
🇦🇪 UAE Tip: In UAE summer above 40°C cure minimum 7 days continuously. Never allow concrete to dry in UAE heat — causes plastic shrinkage cracking. Pour at night or early morning. Target fresh concrete temperature below 32°C at point of discharge.
Calculate thermal resistance for roof, wall and floor insulation.
mm
m²
🇦🇪 UAE Tip: UAE Green Building Regulations require minimum R-3.3 (m²K/W) for roofs in Abu Dhabi and R-4.0 in Dubai. 75-100mm PIR board achieves this requirement. Proper roof insulation saves AED 3,000-8,000 annually in UAE electricity bills.
Calculate BTU and tonnage for UAE buildings based on area and occupancy.
m²
m
🇦🇪 UAE Tip: DEWA requires minimum 3-star energy efficiency for all UAE AC units. 5-star inverter units recommended for energy savings. UAE rule of thumb: 500-600 BTU per m² for well-insulated residential space.
Calculate required water storage tank capacity for UAE buildings.
🇦🇪 UAE Tip: UAE regulations require minimum 24-hour domestic water storage. Use GRP tanks — corrosion resistant in UAE heat. Clean and disinfect every 6 months minimum. Never use galvanised steel tanks for potable water in UAE.
Calculate payback period and 25-year return for UAE solar installations.
kWp
AED
🇦🇪 UAE Tip: DEWA Shams Dubai allows net metering — export excess solar to grid and earn credits at same tariff rate. UAE has excellent solar irradiance (2,000+ kWh/kWp/year). Typical payback period 4-7 years for UAE residential systems.
Calculate apparent temperature and worker safety level for UAE sites.
°C
%
🇦🇪 UAE Tip: UAE Ministry of Human Resources bans outdoor work 12:30pm-3:00pm from June 15 to September 15. Fines for violations from AED 500 to AED 50,000. Provide cool drinking water (250ml every 15-20 min), shade and rest areas for all workers.
Estimate total material cost for UAE construction projects.
m²
🇦🇪 UAE Tip: Standard UAE villa construction material cost: AED 1,800-2,800 per m² BUA (2026 prices). This includes structure, block, plaster, tiles, paint, gypsum and basic MEP. Always budget 15% contingency for UAE projects.
Calculate 5% UAE VAT on construction materials, labour and services.
AED
AED
AED
🇦🇪 UAE Tip: UAE VAT is 5% on all construction services and materials per Federal Decree-Law No.8 of 2017. Always verify contractor TRN at tax.gov.ae before paying VAT. Verify TRN is 15 digits and valid.
Calculate total project budget including all costs and contingency.
AED
AED
🇦🇪 UAE Tip: Always include minimum 10% contingency for UAE new build and 15-20% for renovation. Dubai Municipality permit fees approximately 0.5-1.5% of construction value. Budget AED 50,000-200,000+ for all permits on a standard Dubai villa.
Compare material prices and calculate total for multiple items.
🇦🇪 UAE Tip: Sharjah Industrial Area (Sanaiya) offers 10-20% cheaper materials than Dubai. Mussafah is Abu Dhabi's main materials hub. Buy from authorized dealers only. Get 3 quotes for any order above AED 10,000.
Estimate Dubai Municipality building permit and approval fees.
AED
🇦🇪 UAE Tip: Dubai Municipality fees are calculated on construction value. Apply through Dubai Now app or DM website. Expedited Muwafaq service available for additional fee with 5-7 day turnaround. All drawings must be stamped by a DM-licensed consultant.
Calculate cement bags and sand for any plaster thickness and mix ratio.
m²
mm
🇦🇪 UAE Tip: Always use washed fine sand for UAE plastering. Dune sand and sea sand are prohibited — high salt causes crystallisation and plasterwork failure. For external UAE walls use 1:3 with SRC cement to resist sulfate attack.
Calculate bar count, spacing and weight for slabs and beams.
m
mm
mm
🇦🇪 UAE Tip: Minimum cover: 25mm internal, 40mm external, 50mm in soil or UAE groundwater. Maximum slab bar spacing: 3× effective depth or 750mm. T12 at 150mm is standard for most UAE villa slabs per BS 8110.
Calculate stirrup cutting length and total weight for beams and columns.
mm
mm
mm
🇦🇪 UAE Tip: Standard hook = 10d for UAE stirrups. Add 5% to cutting length for bending losses. T8 at 150mm centres for standard UAE beams, 75-100mm near supports in high shear zones per BS 8110.
Calculate tile adhesive quantity in kg and bags for any application.
m²
🇦🇪 UAE Tip: Use C2 grade adhesive for all UAE floor tiles. Large format tiles need back-buttering method. In UAE summer above 40°C work in sections of no more than 1m² at a time. Use slow-set adhesive in extreme heat.
Calculate grout quantity based on tile size, joint width and area.
m²
mm
mm
mm
mm
🇦🇪 UAE Tip: Use epoxy grout for UAE kitchen splashbacks, bathrooms and pool surrounds. Wait minimum 24 hours (48 hours in UAE summer) after fixing tiles before grouting. Use antifungal grout for UAE coastal bathrooms.
Calculate correct cable size in mm² based on load and cable run.
W
metres
🇦🇪 UAE Tip: At 40°C UAE ambient temperature, cable ratings must be derated by 20-25%. Use XLPE insulated cables (90°C rated) for all UAE installations. Use armoured SWA cables for all outdoor and underground runs in UAE.
Calculate recommended water pipe diameter based on flow rate.
L/min
m
🇦🇪 UAE Tip: Use PPR pipes for all UAE water supply — cold water reaches 40-50°C in uninsulated pipes in UAE summer. Never use GI pipes for drinking water in UAE — corrodes rapidly in UAE water conditions and contaminates supply.
Build a complete Bill of Quantities with UAE VAT automatically calculated.
DESCRIPTIONQTYUNITRATE (AED)
🇦🇪 UAE Tip: Always include 10-15% contingency in UAE BOQs. Break down by section: Substructure, Superstructure, Finishes, MEP, External. All UAE construction contracts over AED 100,000 should have a formal BOQ prepared by a licensed QS.